November 18, 2026

TRIPURA STAR NEWS

Tripura's Latest News, Views & News Portal

Allegations of Substandard Work on Manu Bazar–Srinagar Connecting Road in Sabroom Subdivision Spark Anger Among Locals.

Spread the love

Sabroom, Tripura, 18th of November 2026 : The poor condition of the only major road connecting Manu Bazar to Srinagar in Sabroom subdivision has once again triggered widespread concern among local residents. The newly constructed concrete road, built at a cost of several crores of rupees, reportedly began deteriorating and breaking apart just a day or two after the completion of the work, sparking strong resentment among the public.

Following repeated demands from local residents and the initiative taken by the Chief Minister and the state government, a tender worth several crores of rupees was floated for the reconstruction of the vital Manu Bazar–Srinagar road in Sabroom subdivision. The project was expected to ease the long-standing transportation difficulties faced by commuters.

However, serious allegations have now emerged against the contractor entrusted with the project. Local residents have alleged that the construction agency has resorted to severe irregularities and corruption, resulting in extremely substandard construction work.

Residents expressed dissatisfaction over the alleged silence of the officials responsible for supervising the project, including the Executive Engineer of the Sabroom PWD Division and other concerned authorities, despite the deteriorating condition of the newly constructed road being visible to all.

Small children effortlessly removing pieces of the newly constructed bitumen road and stone chips with their bare hands. The extremely fragile and deteriorated condition of the road has left local residents, as well as daily commuters, shocked and disappointed. They have alleged that a major portion of the government funds allocated for the project is being misappropriated in the name of carrying out construction work of merely superficial quality.

Residents further pointed out that the road repeatedly returns to its previous dilapidated condition within just a few days of repair or reconstruction, causing severe inconvenience to daily commuters from the Srinagar area and people travelling between Srinagar and Manu Bazar. Expressing their anger over what they described as the contractor’s irresponsible approach and substandard construction work, local residents brought the matter before the media and voiced their grievances.

The aggrieved residents have also warned that if the concerned department fails to address the alleged negligence, they may launch a larger public agitation over the condition of the road in the coming days.

Now, it remains to be seen what action the Executive Engineer of the Sabroom PWD Division takes in response to the numerous complaints raised over the construction of this road.